re: SEZ Addition - What to do With New Facade?

Posted on 7/29/14 at 1:31 pm to
Posted by LouisianaLonghorn
Austin, Texas
Member since Jan 2006
14239 posts
Posted on 7/29/14 at 1:31 pm to
quote:

The LEGO blocks are a temporary solution so that the bathrooms will be functional for this season. The stadium was put way behind schedule due to some soil conditions that differed materially from those on the plans. They had to drive more and deeper piles than initially planned, plus there were tons of utilities present that were not on any of their maps. They basically ran out of time to finish the bathrooms because of this, so they threw up the LEGO blocks so that they would at least be functional. During the offseason, that part of the addition will be finished, aka no more lego blocks.


Since you seem to be in the know, wasn't the TAF building facade supposed to be all glass?
Posted by Sev09
Nantucket
Member since Feb 2011
15577 posts
Posted on 7/29/14 at 1:35 pm to
quote:

Since you seem to be in the know, wasn't the TAF building facade supposed to be all glass?


He's not in the know...

That seems ridiculous. Plus, the "lego blocks" are in the original rendering.


Which was posted as the pile-driving started.
This post was edited on 7/29/14 at 1:36 pm
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram