Started By
Message

re: SEZ Addition - What to do With New Facade?

Posted on 7/29/14 at 1:26 pm to
Posted by Duckie
Tippy Toe, Louisiana
Member since Apr 2010
24314 posts
Posted on 7/29/14 at 1:26 pm to
quote:

The LEGO blocks are a temporary solution so that the bathrooms will be functional for this season. The stadium was put way behind schedule due to some soil conditions that differed materially from those on the plans. They had to drive more and deeper piles than initially planned, plus there were tons of utilities present that were not on any of their maps.

They basically ran out of time to finish the bathrooms because of this, so they threw up the LEGO blocks so that they would at least be functional. During the offseason, that part of the addition will be finished, aka no more lego blocks.


well, there ya go. Bunch of morons in here.
Posted by foj1981
Baton Rouge
Member since Nov 2013
3760 posts
Posted on 7/29/14 at 1:31 pm to
Hope this is true but all of the pre construction renderings show the Lego block buildings.
Posted by monsterballads
Make LSU Great Again
Member since Jun 2013
29270 posts
Posted on 7/29/14 at 1:37 pm to
quote:

well, there ya go. Bunch of morons in here.


the lego blocks were in the original rendering
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram