Started By
Message

re: Price per cubic yard for concrete?

Posted on 2/22/13 at 2:54 pm to
Posted by 4LSU2
Member since Dec 2009
37347 posts
Posted on 2/22/13 at 2:54 pm to
A 34M (meter) pump truck that comes with a 112' boom is currently running $130/ hour and also has a yardage rate of $2.75/ cubic yard with a 4 hour minimum. This is in the BR/ NOLA/ Northshore area of the country.

You may need to check your calculations on the garage as well.
Posted by J.Peterman
Myanmar
Member since Jan 2013
227 posts
Posted on 2/22/13 at 3:56 pm to
Thank you 4LSU2 and anyone else who contributed. That was exactly the kind of information I was looking for.

Sorry guys, I am also trying to get a little work done before I head home for the day. I was planning on reading the responses when I got home, but the thread took off a little quicker than expected.
This post was edited on 2/22/13 at 3:59 pm
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram