Started By
Message

re: BR this weekend

Posted on 7/20/12 at 1:21 pm to
Posted by Cajun_Jedi
Baton Rouge
Member since May 2012
51 posts
Posted on 7/20/12 at 1:21 pm to
quote:

Saw the plans recently for this intersection. There widening it and taking that giant hump from the rr crossing away. Adding turning lanes on all sides. They said it should construction should last almost a year and of course there probably gonna start doing the construction right when students move in. BRTIOOC


Where exactly did you see these plans?

I pass this intersection too and from work everyday. I try going down river road to brightside then jump on Nicholson or I'll go all the way down nicholson. Grass is always greener.

The solution is so simple it's stupid......Kinda like last year's quarterback dilemma. just had to throw that out there
Posted by bbap
Baton Rouge, LA
Member since Feb 2006
96074 posts
Posted on 7/20/12 at 1:37 pm to
I posted a link with an update but no plans. and i agree its simple. but it also cost 10 million dollars. i mean its not like fairies just came from neverland and just waved their wand and the road was corrected.

with that said it should have been done long ago. glad its finally being done.
Posted by HowboutthemTigers
BHAM
Member since Dec 2007
2632 posts
Posted on 7/20/12 at 3:09 pm to
quote:

Where exactly did you see these plans?

WBRZ did a piece on it a month or two ago and showed them as "projected plans". I dont know how they're going to deal with the railroad tracks but if they do BR road construction like usual, im sure itll be nothing more than a huge cluster frick.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram