Started By
Message

re: Best way to move a shed

Posted on 5/29/12 at 10:31 pm to
Posted by chalupa
Member since Jan 2011
6765 posts
Posted on 5/29/12 at 10:31 pm to
quote:

Yeah I know, but given the location of the shed, I can't get behind it to pull.


No trees behind it to hook up a couple of comealongs?
Posted by Bleeding purple
Athens, Texas
Member since Sep 2007
25315 posts
Posted on 5/29/12 at 10:55 pm to
4" schedule 40 PVC will do just fine and is plenty strong enough. With 12 foot long I would think 6-8 pieces should be plenty. Jack up the leading edge and insert a few pieces.

I would use a basic pully around a tree or a post driven in the ground (telephone pole buried 4 ft or so or a heavy steel pipe)to pull it forward. Drill through the two skids for attachment points for your rope. Once it is on the pipe it won't take much to move it. Go slowly!


Good luck.
Posted by crazytigerfan69
everywhere
Member since Apr 2004
5702 posts
Posted on 5/30/12 at 6:09 am to
quote:

No trees behind it to hook up a couple of comealongs?

No, unless I want to pull off one of my fence posts....
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram