re: Cancellation of Mid-Barataria Diversion project could cost Louisiana at least $700 million

Posted on 5/10/24 at 10:00 am to
Posted by Indefatigable
Member since Jan 2019
27421 posts
Posted on 5/10/24 at 10:00 am to
quote:

The construction cost overruns will likely consume the entire mitigation budget.

The contingency funds for cost overruns are completely separate from the mitigation funding.
Posted by Marshhen
Port Eads
Member since Nov 2018
675 posts
Posted on 5/10/24 at 10:13 am to
quote:

The contingency funds for cost overruns are completely separate from the mitigation funding.


That’s just not true. At the last TIG meeting in 2023 the question was asked and answered that the mitigation fund was to be used for construction overruns as well. But the State assured everyone that there would be no overruns because the CMAR contractor was going to “guarantee” the maximum cost.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram