re: Adding new sewer drain concrete slab house

Posted on 4/29/24 at 10:17 pm to
Posted by Clames
Member since Oct 2010
16733 posts
Posted on 4/29/24 at 10:17 pm to
quote:

Is there a standard practice for how this is done retroactively through foundation? Do you drill down and then horizontally out through beam that is approx level (higher with grading) with drain?



For me, lots of planning, layout, and area prep. Then I grab my SDS+ and SDS Max hammer drills, gas-powered concrete demo saw, and probably a pair of angle grinders with cutting/grinding wheels for both metal and concrete, some hand tools for digging/prying, then curse myself for the mess I am going to have to clean up. Plumbing in the water lines, sewer connection, clean out, and vent pipe, proper backfilling, then patching the concrete will be a lot of work too. Assuming with the older house you aren't dealing with post-tensioning but there might be rebar you could run into which is always fun.


Yeah, that's not a job I'd want to tackle unless I had a few days without interruption and some good beer waiting in the evenings.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram