Started By
Message

re: Good news, the Bluebonnet overlay work should be completed by Feb 2026

Posted on 4/17/24 at 1:44 pm to
Posted by modes
Member since May 2017
258 posts
Posted on 4/17/24 at 1:44 pm to
it looks like they're addressing/adding the drainage as they make their way down each side adding a new curb. Eventually it looks like they'll asphalt over the current road base. Absolutely absurd that it's been almost a year with this god-awful road.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram