Started By
Message

re: Comite River Diversion Canal Project

Posted on 1/9/23 at 7:42 am to
Posted by ColdDuck
BR via da Parish
Member since Sep 2006
2781 posts
Posted on 1/9/23 at 7:42 am to
They finished the train and road bridge over 61 and you can see the massive trench from hwy 19 through Zachary to 61. Seems like it is pretty close. They need a bridge over 964 a and 19 still. It will probably suck to live in Zachary while they are working on the 964 bridge since that is the major roadway to BR.
Posted by ike221
Loo A Vul
Member since Aug 2006
13710 posts
Posted on 1/9/23 at 7:44 am to
Also a bridge over plank, railroad bridge next to 19. Bridge over old baker road.

They need to complete the McHugh rd bridge as well

There exists lots of work to complete this prohect
Posted by goofball
Member since Mar 2015
16928 posts
Posted on 1/9/23 at 8:24 am to
quote:

It will probably suck to live in Zachary while they are working on the 964 bridge since that is the major roadway to BR.




This is a moat for Zachary. They are loving this.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram