Started By
Message

re: How many of you baws went to the public meeting last night about the new bridge?

Posted on 4/26/22 at 8:22 am to
Posted by Slippy
Across the rivah
Member since Aug 2005
6617 posts
Posted on 4/26/22 at 8:22 am to
quote:

Building a road that exits I-10 just east of Grosse Tete connecting to a bridge by Dow and putting a road through Spanish Lake to Bluff Rd. is what needs to happen.


The Dow-adjacent crossing has already been ruled out, supposedly for navigational reasons. There isn't enough money to do the Grosse Tete connection, but you're right that it needs to happen.



One of the routes south of Plaquemine seems to be the ticket.
Posted by doubleb
Baton Rouge
Member since Aug 2006
36446 posts
Posted on 4/26/22 at 8:36 am to
Their website “scores” every crossing. Some are more advantageous than others. There’s a lot of good info on that site.
Just looking at lines on the map doesn’t tell the whole story.

mrbsouth.com
This post was edited on 4/26/22 at 8:40 am
Posted by NativeLouisianaian
Member since Apr 2022
97 posts
Posted on 4/26/22 at 5:06 pm to
Welcome to South Louisiana where we only build roads and bridges that turn into bottlenecks.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram