Started By
Message

re: Setting a 4x4 fence post in concrete on top of 2" schedule 40 pvc pipe

Posted on 3/20/22 at 8:19 pm to
Posted by stout
Smoking Crack with Hunter Biden
Member since Sep 2006
167893 posts
Posted on 3/20/22 at 8:19 pm to
quote:

leaving 8" of soil/clay protecting pvc?



If you are asking if that is enough to keep the concrete from damaging the PVC then yes. Keep in mind PVC is used in concrete all of the time when pouring slabs but only for drain lines. The only issue I see is if you need to make repairs to any of the PVC in the future.

I would consider setting the post with the foam fence post kits since it is easier to remove in the future if need be.
This post was edited on 3/20/22 at 8:21 pm
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram