Started By
Message

re: What's happening on 73 in Pville?

Posted on 11/17/16 at 8:26 pm to
Posted by ellunchboxo
G-Town
Member since Feb 2009
19539 posts
Posted on 11/17/16 at 8:26 pm to
quote:

Big Daddy Kane


Posted by Venelar
The AP
Member since Oct 2010
1226 posts
Posted on 11/17/16 at 8:35 pm to
quote:

Speaking of, did they just flat out ditch Hwy 42 construction?





Next phase is on bid til march
Posted by fightin tigers
Downtown Prairieville
Member since Mar 2008
79729 posts
Posted on 11/17/16 at 8:45 pm to
quote:

Next phase is on bid til march


fricking beautiful.

AP politicians have been fricking that parish for years and the residents are too blind to see it.

Just build another park to bring your kids to instead of improving infrastructure or challenging the uncontrolled sprawl for fear of a lawsuit.
Posted by RealityTiger
Geismar, LA
Member since Jan 2010
20543 posts
Posted on 11/17/16 at 9:31 pm to
What the frick? The whole project wasn't bid as a complete task? And what exactly is a contractor supposed to do in the meantime while these crooks try to scrounge up the money they should have already had in place? Bidding a job piecemeal like that is a red flag.
Posted by SG_Geaux
Beautiful St George, LA
Member since Aug 2004
80812 posts
Posted on 11/17/16 at 9:35 pm to
quote:

Bidding a job piecemeal like that is a red flag


You have never heard of a job being done in different phases?
Posted by fightin tigers
Downtown Prairieville
Member since Mar 2008
79729 posts
Posted on 11/17/16 at 9:40 pm to
Phase 1: put a project on hold for 20 years
Phase 2: frick up the whole works
Phase 3: pretend it is business as usual
Phase 4: overpay since you are in a bind
Posted by RealityTiger
Geismar, LA
Member since Jan 2010
20543 posts
Posted on 11/17/16 at 9:49 pm to
Yes I have. Was an estimator for ten years. What's your point?

We're talking about widening a road. Not building a hospital.
Posted by RealityTiger
Geismar, LA
Member since Jan 2010
20543 posts
Posted on 11/18/16 at 7:41 am to
Who's to say that the price of material used in the original bid hasn't doubled by the time the work starts up again? Same thing with labor. And I guarantee the contractor with the lowest price who was awarded the job did not anticipate that, or else they wouldn't have had the lowest bid.

Or maybe they did, and are using skeleton crews working straight time only as an answer, to make up for the projected loss in profit. The more I think about it, this is probably the most likely scenario and is why it took three years to complete phase one. And phase one looks like not even 25% of the work to be done.

This is why it takes 4 times the amount of time to get roadwork done here as opposed to other states.
first pageprev pagePage 2 of 2Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram