Started By
Message

re: City Council passes package of measures to probe Entergy New Orleans' Ida response

Posted on 9/23/21 at 10:09 pm to
Posted by DVinBR
Member since Jan 2013
13025 posts
Posted on 9/23/21 at 10:09 pm to
Lake Charles didn't probe Entergy Louisiana after Laura obliterated the grid over there.

People just understand the eye while it was still a strong CAT3 crossed over all of the Transmission infrastructure that feeds New Orleans from around/south of Baton Rouge (mainly Willow Glen) (with exception of the line in NOLA east that goes to Slidell)
Posted by fightin tigers
Downtown Prairieville
Member since Mar 2008
73681 posts
Posted on 9/23/21 at 10:14 pm to
quote:

People just understand the eye while it was still a strong CAT3 crossed over all of the Transmission infrastructure that feeds New Orleans from around/south of Baton Rouge (mainly Willow Glen) (with exception of the line in NOLA east that goes to Slidell)


There is a bit more than that. There was an idle plant in the East that was sold a base generation (no where near enough for complete power) that could have kept some power to the city.

Entergy sold that plant to be one thing and then it wasn't.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram