Started By
Message

re: New Bridge over Mississippi River at least 4 years from groundbreaking

Posted on 3/30/21 at 1:32 pm to
Posted by BorrisMart
La
Member since Jul 2020
8822 posts
Posted on 3/30/21 at 1:32 pm to
quote:

A loop is needed to make the entire grid work that bypasses Baton Rouge


that is what I'm saying. if they put an exit for a new bridge right before the current bridge its just gonna cause problems on that side. It needs to completely go below the city down to Gonzales or something and swing back up to i12 somewhere to completely take that traffic out of the city.
This post was edited on 3/30/21 at 1:47 pm
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram