Started By
Message

re: Over 1,000 jobs cut by company building Keystone XL pipeline after Biden ends project

Posted on 1/22/21 at 12:36 pm to
Posted by Traveler
I'm not late-I'm early for tomorrow
Member since Sep 2003
24371 posts
Posted on 1/22/21 at 12:36 pm to
quote:

blades on the wind turbines only last 2 years

I thought the design limits was 20? Either way, that is a lot of stacking for retired blades. They have to go somewhere.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram