Started By
Message

re: Facility upgrades coming. CV-19 may delay announcement

Posted on 4/8/20 at 8:09 am to
Posted by PBJ
Member since Apr 2014
110 posts
Posted on 4/8/20 at 8:09 am to
The trend in new stadium construction and redos is a normal lower bowl, open plaza level and then suites stacked 6-7 levels high replacing upper level seating. Probably can’t do all that with historical nature of TS.

I would expect a redo of PMAC and some sort of shared plaza level to be a part of this.
Posted by Cincinnati Bowtie
Sparta
Member since May 2008
11951 posts
Posted on 4/8/20 at 8:40 am to
Abate the Asbestos in the old dorm rooms and change the areas for restaurant type concessions with huge bathrooms. There’s South, East and North Dorms.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram