Started By
Message

re: Mayor's team reacts to finishing Bourbon St project - Spin Doctors doing work

Posted on 11/16/19 at 4:33 pm to
Posted by Napoleon
Kenna
Member since Dec 2007
69423 posts
Posted on 11/16/19 at 4:33 pm to
To be fair a lot of the cost overruns were because the infrastructure was in much worse shape than expected. They had to change sewage, drainage, gas and power conduits.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram