Started By
Message

re: Federal Judge Halts Bayou Bridge Pipeline..But Photos Show Damage Already Done

Posted on 2/26/18 at 4:38 pm to
Posted by lsufan112001
sportsmans paradise
Member since Oct 2006
10722 posts
Posted on 2/26/18 at 4:38 pm to
75 feet is the typical width of such a pipeline

If it’s paralleling an existing right of way there should be no concern It’s not fragmenting habitat ...
This post was edited on 2/26/18 at 4:40 pm
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram