Started By
Message

re: Just Announced: Feds to pay for Baton Rouge to build 10 mile northern loop

Posted on 8/16/17 at 10:05 am to
Posted by doubleb
Baton Rouge
Member since Aug 2006
36530 posts
Posted on 8/16/17 at 10:05 am to
quote:

Map of the trail network that is being built in sections (some of it has already been built) in East Baton Rouge.


I'm guessing less than 5% of these trails have been built. They have a very long way to go and at a million dollars per mile its going to be extremely expensive.

Hopefully it will be heavily used, but so far from what I've seen the few trails I pass by are not being used hardly at all.

But I don't go by many of the; just the levee trail, the one along Nicholson by LSU, and the ones by the mall and that's it.

ETA: who is supposed to maintain these bike paths? The one along Nicholson between Brightside and LSU is not being kept up. Weeds have grown over half of it and its beginning to silt over in places. Few people use this on a regular basis. This may be why.
This post was edited on 8/16/17 at 10:17 am
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram