Started By
Message

re: Building cost / sq. Ft.

Posted on 6/15/17 at 8:41 am to
Posted by HamCandy
Team Meat
Member since Dec 2008
896 posts
Posted on 6/15/17 at 8:41 am to
Built in Covington 1 year ago with a Contractor.

$145.00 per sf living.

$104.00 per sf underbeam.

A few things to consider in those SF prices:
1) included clearing a heavily wooded 3/4 acre lot.
2) lots of fill to get the house slab to grade.
3) No city water or sewerage so I had to buy a Well and Septic tank (not cheap)
4) The underbeam SF includes the garage. BUT doesn't include a 345 SF unfinished bonus room above the garage.
5) I have mid to high range finishes with tall ceilings, open floor plan.

The building process was fun for us, I hope the same for you!
This post was edited on 6/15/17 at 8:43 am
Posted by PLaneTiger
Member since Jun 2014
863 posts
Posted on 6/15/17 at 8:51 am to
What was the costs involving getting your lot and getting it prepared?
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram