Started By
Message

re: Deck Help

Posted on 3/9/17 at 9:38 am to
Posted by wickowick
Head of Island
Member since Dec 2006
45849 posts
Posted on 3/9/17 at 9:38 am to
quote:

There's a gradient to the yard. The side of the deck closest to my existing patio will be the same height as the patio (~6"). The outer side will probably be about a foot off the ground.


shite, I would probably just pour concrete on for the entire thing. It would be cheaper than the decking and much faster. You could stain or add stone over the concrete if you desired.
Posted by bluemoons
the marsh
Member since Oct 2012
5538 posts
Posted on 3/9/17 at 9:41 am to
How much do you think I'd be looking at for a ~20'x~15' slab? Labor included.

I could probably frame it myself, but they won't be able to get a truck into the back yard. They'd probably need a power buggy.

eta: also, how much does stamping/staining concrete add to the cost?
This post was edited on 3/9/17 at 9:45 am
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram