Started By
Message

re: Landscape help - drainage problems

Posted on 4/4/16 at 8:26 pm to
Posted by hedgehog
Prairieville
Member since Oct 2006
2289 posts
Posted on 4/4/16 at 8:26 pm to
If I'm getting concrete areas/pads added to my yard for a boat and a storage shed, should I wait to do the drainage work after the concrete is poured? Yes the new concrete will be in the area that the pipes will drain.
Posted by lsugrad35
Jambalaya capital of the world
Member since Feb 2007
3199 posts
Posted on 4/5/16 at 9:10 am to
Of course you should. 1. Use the dirt that is removed when forming up for concrete to fill low spots. 2. Pour concrete. 3. Evaluate drainage situation when it rains again after steps 1 and 2 have been completed. 4. Take corrective action with drains, catch basins and PVC has whodat has shown. Adding concrete is going to change your drainage situation so you wouldn't do anything until after that is complete.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram