- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
Posted on 7/10/15 at 10:08 pm to LewDawg
quote:
Did they ever finish 264?
Yeap, then had to turn around and partially redo it. They figured out the section running from the Norfolk bridge-tunnel had been built without the crown on the road. They figured it out 3 months before they were supposed to be done.
Actually, scratch that. I am thinking of the new interchange they built where 664 meets 64 in Hampton.
Talk about a colossal frick up. After 5 years of road construction, how do you miss the crown?
and yes, they did finally finish 264. Headed south they only ran it to 664. Many times I found that a quicker way to get back to Hampton from Va Beach than 64. Traffic is horrendous around there.
Popular
Back to top
![logo](https://images.tigerdroppings.com/images/layout/TDIcon.jpg)