Started By
Message

re: Nicholson @ Brightside Green Light Project

Posted on 5/14/14 at 2:10 pm to
Posted by CarRamrod
Spurbury, VT
Member since Dec 2006
57524 posts
Posted on 5/14/14 at 2:10 pm to
quote:

I think you can drive on it after 7 days, but to fully cure is 28. I don't know if I'm remembering that right from school...I'm not on the construction side of things.

yea i take up for alot of engineering/construction issues, but the Essen debacle is laughable. there has been no work on it for 3 months. you can open a lane less than a week after concrete is poured.
Posted by The Sad Banana
The gate is narrow.
Member since Jul 2008
89498 posts
Posted on 5/14/14 at 2:14 pm to
I was in that area last night and forgot to ride down Staring. It's still not all the way open?
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram