Started By
Message

re: 1st hitch offshore

Posted on 3/1/14 at 8:03 am to
Posted by CHEDBALLZ
South Central LA
Member since Dec 2009
22267 posts
Posted on 3/1/14 at 8:03 am to
If he's installling waste systems as mentioned it will probably be a 2 or 3 man service crew working out of their own toolbox and what not. Everything will probably be done in under a week and thet will be gone untill the next job pops up on another rig. NBD. The roustabouts on deck normally take care of the service hands. As mentioned, food is hit or miss.
Posted by RaginCajun87
Member since Jul 2013
353 posts
Posted on 3/1/14 at 9:10 pm to
quote:

If he's installling waste systems as mentioned it will probably be a 2 or 3 man service crew working out of their own toolbox and what not. Everything will probably be done in under a week and thet will be gone untill the next job pops up on another rig. NBD. The roustabouts on deck normally take care of the service hands. As mentioned, food is hit or miss.


This. I am an engineer who basically manages installs of our equipment on drilling rigs. Most jobs don't go over 2 weeks... Most.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram