Started By
Message

re: Confirmed: Braves Leaving Turner Field After 2016 Season

Posted on 11/11/13 at 9:05 am to
Posted by hiltacular
NYC
Member since Jan 2011
19708 posts
Posted on 11/11/13 at 9:05 am to
There is absolutely no way a stadium can be inserted into the 75/285 section they have listed without MAJOR transportation work being done.

That cluster is probably the most congested area of traffic in all of atlanta.

With that said, if they can figure out the transportation problem, this is just a great move.
This post was edited on 11/11/13 at 9:07 am
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram