Started By
Message

re: South Endzone/North Stadium Plaza Construction Update- 7/17

Posted on 7/17/13 at 10:19 pm to
Posted by GeorgeReymond
Buckhead
Member since Jan 2013
10188 posts
Posted on 7/17/13 at 10:19 pm to
Yes I would say so. They have also been working on some additions that LSU.sports hasn't been posting:

1) They are putting up small pillars (or something of the sort) down the area where the Mike statue is, located between the west side of the stadium and Nicolson.

2) They added a huge archway to the entrance of the sports admin office at the end of Dalrymple. It looks really good. Saw them putting letters up this afteroon. It's called the Moran Athletics Administritive Building or something of that nature. It also has the underlit "LSU" on the posts of the archway similar to the entrance on the westside on the stadium.

ETA: I'm not a fan of the prefab concrete look they chose, looks cheap beside the stadium; however IMO it looks really good on the Sports Admin Office

I'll try and snap a picture and upload tomorrow morning
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram