- My Forums
- Tiger Rant
- LSU Score Board
- LSU Recruiting
- SEC Rant
- SEC Score Board
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: South Endzone/North Stadium Plaza Construction Update- 7/17
Posted on 7/17/13 at 7:25 pm to fatboydave
Posted on 7/17/13 at 7:25 pm to fatboydave
When you live in Asia you find out that you really never needed a Bathroom, Toilet Paper, Towels, Hot Water, or any other of that kind of stuff. You people are spoiled bad!!!
Posted on 7/17/13 at 7:32 pm to lsuhunt555
quote:
It will be ready on time!
Posted on 7/17/13 at 7:41 pm to HowboutthemTigers
I wonder if they have some leftover paint from when they painted the north end. Maybe they can use it to paint the new yellow/tan columns that match nothing.
Posted on 7/17/13 at 7:42 pm to T
Grey stadium
Tan columns
Brown west side
Tan columns
Brown west side
Posted on 7/17/13 at 8:45 pm to HowboutthemTigers
They are also working on the North Endzone big screen. They have added about 10-15 feet to both sides of the screen and putting all the sound systems in there.
Posted on 7/17/13 at 9:24 pm to lsutigermall
That is alot of concrete left to pour. Are they working 24/7?
Posted on 7/17/13 at 9:52 pm to TigerFanNKaty
They're bricking most of the rest of it. However there are some areas that concrete still has to be poured. Not much though
Posted on 7/17/13 at 9:54 pm to GeorgeReymond
So most of what is left is pre-cast?
Posted on 7/17/13 at 9:55 pm to TigerFanNKaty
quote:
That is alot of concrete left to pour. Are they working 24/7?
There were some guys still out there after sunset one day last week. They'll get it done.
FYI they are also working on the Champions plaza/walkway on the west side of the stadium.
Posted on 7/17/13 at 10:19 pm to TigerFanNKaty
Yes I would say so. They have also been working on some additions that LSU.sports hasn't been posting:
1) They are putting up small pillars (or something of the sort) down the area where the Mike statue is, located between the west side of the stadium and Nicolson.
2) They added a huge archway to the entrance of the sports admin office at the end of Dalrymple. It looks really good. Saw them putting letters up this afteroon. It's called the Moran Athletics Administritive Building or something of that nature. It also has the underlit "LSU" on the posts of the archway similar to the entrance on the westside on the stadium.
ETA: I'm not a fan of the prefab concrete look they chose, looks cheap beside the stadium; however IMO it looks really good on the Sports Admin Office
I'll try and snap a picture and upload tomorrow morning
1) They are putting up small pillars (or something of the sort) down the area where the Mike statue is, located between the west side of the stadium and Nicolson.
2) They added a huge archway to the entrance of the sports admin office at the end of Dalrymple. It looks really good. Saw them putting letters up this afteroon. It's called the Moran Athletics Administritive Building or something of that nature. It also has the underlit "LSU" on the posts of the archway similar to the entrance on the westside on the stadium.
ETA: I'm not a fan of the prefab concrete look they chose, looks cheap beside the stadium; however IMO it looks really good on the Sports Admin Office
I'll try and snap a picture and upload tomorrow morning
Popular
Back to top
Follow TigerDroppings for LSU Football News