re: Cranes going up for the SEZ expansion (Updated)

Posted on 3/14/13 at 1:41 pm to
Posted by MRTigerFan
Baton Rouge
Member since Sep 2008
4243 posts
Posted on 3/14/13 at 1:41 pm to
quote:

Of course they don't take that long to get one operational if really needed. You could probably have the piling done in a day, the formwork done in a few days and ready to pour and then at least 7 days for the breaks. So within 2 weeks you can have all 3 operational if you put enough man power behind but that's not what usually happens and isn't what happened on this project. They took at least a month and half, probably longer from start to finish.


How dare you bring that kind of accurate knowledge and actually state facts on the rant! GTFO
Posted by junkfunky
Member since Jan 2011
33963 posts
Posted on 3/14/13 at 1:51 pm to
quote:

How dare you bring that kind of accurate knowledge and actually state facts on the rant! GTFO


I know what Ram was talking about, and I kinda did make it sound like it was a typical construction time.

What's been going on? Yeah, after the source for my teabagger pick was removed I tried using this old one. The timing was weird but apparently it didn't meet the size requirements.

You watching the game?
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram