Started By
Message

re: Do I have a shite contractor?

Posted on 8/18/12 at 7:09 am to
Posted by MoreOrLes
Member since Nov 2008
19472 posts
Posted on 8/18/12 at 7:09 am to
Did you have a set of plans that specified these issues?

Did all the contractors bid those plans so that everyone was bidding apples to apples?

Out of curiosity what was this guys total bid and what was the next lowest guys bid.

Did you check 3.or more past references before you chose this GC?
Posted by SuwMwf
Member since Jul 2012
974 posts
Posted on 8/18/12 at 10:58 am to
Yes I have plans that had the additional built ins on them and they were supplied to me by the contractor.

Only one contractor bid the whole job. I liked his work and he was reputable to me at that time. Had been watching his work for about 2 years before we went ahead.

When all is said and done GC said he could do it for 401k. FWIW the guy next door built a house with another GC and they built his house for the EXACT same amount per square foot.

Yes I spoke with 3 or more past references PLUS the guy's at the time soon to be ex-wife. He is building her a house too ATM. All of them said good stuff including the ex.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram