Started By
Message

re: Renderings of expansion from LSU

Posted on 4/19/12 at 11:20 pm to
Posted by mikethetiger
Member since Nov 2004
1879 posts
Posted on 4/19/12 at 11:20 pm to
The renderings released by LSU seem to be preliminary and will probably evolve in the next few months when more engineering work is incorporated into the design. You can see examples of how designs of the baseball and softball stadiums evolved from concept to finished product below for an example of what I am talking about:

Baseball rendering released around August 2006


Baseball rendering released around December 2006 (notice they raised the suites/press box another level and the stairs were moved inwards)


Baseball construction started June 2007


Baseball stadium as built




Softball rendering early release


Softball rendering later release (notice the area below the roof at the back of the stadium)


Softball stadium as built (notice the roof is no longer a cantilever design but is more a suspension design)
Posted by AcetylCoA
Pasadena, California
Member since Nov 2009
2654 posts
Posted on 4/20/12 at 1:33 am to
quote:

mikethetiger

Why did you ruin this thread with reason, logic, and intellect. Shame on you.
Posted by johnfredlsu
Member since Feb 2007
548 posts
Posted on 4/20/12 at 5:47 am to
Great. Hopefully the concern I've talked about will be addressed then. Thanks for this info!
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram