- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: First steps of South endzone expansion
Posted on 2/14/12 at 10:59 pm to Ghostfacedistiller
Posted on 2/14/12 at 10:59 pm to Ghostfacedistiller
What does a complete high def survey consist of?
Posted on 2/14/12 at 11:09 pm to rohanman
They didn't do the whole stadium in great detail because they weren't paid to and as you can imagine it's not cheap and Tiger Stadium is pretty detailed structure. They did do enough to make a pretty sweet graphic but not enough to really do work from.
Basically they surveyed the curve of the south endzone from about 6 angles and the data is cross referenced for precision and put into point cloud data to have an accurate and interactive assessment of the physical structure and dimensions. It took 2 or 3 days of surveying to get what was needed just for the endzone. It was done for Lamoine and used pre design and pre construction (obviously pre construction).
Basically they surveyed the curve of the south endzone from about 6 angles and the data is cross referenced for precision and put into point cloud data to have an accurate and interactive assessment of the physical structure and dimensions. It took 2 or 3 days of surveying to get what was needed just for the endzone. It was done for Lamoine and used pre design and pre construction (obviously pre construction).
This post was edited on 2/14/12 at 11:11 pm
Popular
Back to top
Follow TigerDroppings for LSU Football News