- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Coaching Changes
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
How long should it take to get windows?
Posted on 7/25/25 at 8:35 am
Posted on 7/25/25 at 8:35 am
For some context-our home was damaged by a tornado back on May 16. Contractor was pretty fast in getting a new roof up. Insurance wrote for new siding, windows and fascia/soffet, trim etc.
Siding arrived probably four weeks ago and has been sitting in the front yard. Contractor keeps saying windows is the holdup. Told me week before should be end of that week. Friday came and nothing, still no word or text, call etc.
So what's a reasonable timeline for windows to be manufactured and delivered?
Siding arrived probably four weeks ago and has been sitting in the front yard. Contractor keeps saying windows is the holdup. Told me week before should be end of that week. Friday came and nothing, still no word or text, call etc.
So what's a reasonable timeline for windows to be manufactured and delivered?
Posted on 7/25/25 at 8:53 am to BluegrassCardinal
We ordered 2 new doors and a 6 foot by 6 foot window through a window company in Mandeville 4 weeks ago.....they said 3 to 6 weeks for all 3.
Posted on 7/25/25 at 9:07 am to BluegrassCardinal
depends on the window. standard vinyl windows should be no longer than 3 weeks. black windows may add a couple of weeks. if you have shapes (arches,eyebrows) that adds time, sdl bars add time, special glass adds times. if you are doing clad windows baseline time should be 5-6 weeks with all of the above mentioned things adding time to these as well.
Posted on 7/25/25 at 9:22 am to BluegrassCardinal
Just picked up 29 custom sized double paned within 10 days of giving them the dims here in Houston. AL frame
This post was edited on 7/25/25 at 9:23 am
Posted on 7/25/25 at 9:30 am to BluegrassCardinal
3-4 weeks for standard sizes. Some companies will stock some standard sizes so you can get them pretty fast. If non-standard... 6 weeks or more.