Fix for stair pilings

Posted on 9/25/24 at 11:40 am
Posted by tigerbait1970
H-Town
Member since Oct 2007
767 posts
Posted on 9/25/24 at 11:40 am
The stair pilings at my camp are a little rotted at the bottom and I'm thinking of taking a 3 gallon bucket, split it down the middle and cut out the bottom to use as a form to pour concrete in. Think this will work and provide a somewhat decent long term solution?

Thanks



Posted by Sparty3131
Baton Rouge
Member since Feb 2019
900 posts
Posted on 9/25/24 at 12:15 pm to
Does the camp get water under there periodically? if so I would use concrete above the maximum depth of the water. So if it floods 8" make the bottom foot concrete or so.

II would run a 4x4 or 4x6 between the posts horizontally and level. Bolt it thought the legs above any rot Then use a floor jack to take the tension off the legs. Cut the rot out and slip in the concrete block you make. Use a galvanized L bracket to connect the block into the existing concrete with red head anchors and a roto hammer. You could also pour the brackets into the concrete by pushing them into the top of the bucket before it sets and then you flip it upside down and are ready to slide it in and anchor it down.

Make sure the jack is rated to handle the weight, and the blocks are ready to go under and sized based on the amount of rot removed (height). Use the jack by one leg at a time, not the middle.
Posted by Sparty3131
Baton Rouge
Member since Feb 2019
900 posts
Posted on 9/25/24 at 12:22 pm to
Also connect the legs to the concrete with brackets.
Posted by baldona
Florida
Member since Feb 2016
23591 posts
Posted on 9/25/24 at 1:32 pm to
quote:

The stair pilings at my camp are a little rotted at the bottom and I'm thinking of taking a 3 gallon bucket, split it down the middle and cut out the bottom to use as a form to pour concrete in.


They sell cardboard forms to do this that would likely do better, I don't know the cost but they can't be much. I'm not sure if that's the best plan here or not.

I have seen people just use a standard car jack and jack the deck up just enough to work on the board though.
Posted by junkfunky
Member since Jan 2011
35922 posts
Posted on 9/25/24 at 2:35 pm to
Jack the structure above up and temporary support the framing. Cut out at least a foot at the bottom of the column then attach a column base with a dowel or bent bar where you cut the column. Drill and epoxy (4) #5 (or so) bars into the concrete with #3 ties (should be round but if square clears the column you should be fine) at the top and bottom (2" from the existing concrete and 2" from what will be the top of the concrete pier. Place a sonotube form centered on the column and pour your concrete. If you don't use a vibrator make sure you pour a little at a time and bang on the form all around.

Remove the form after 3 days.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram