- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: Cancellation of Mid-Barataria Diversion project could cost Louisiana at least $700 million
Posted on 5/10/24 at 2:59 pm to Marshhen
Posted on 5/10/24 at 2:59 pm to Marshhen
quote:
Well, I have developed 10 formal bids for dredging projects in the past 6 months
So that narrows you down to someone who works for either:
1) a private dredge contractor, who would stand to benefit most from redirected funds from diversions, or
2) MVN navigation ops, and the USACE is has proven they really know how to run a delta over the longterm
![](https://images.tigerdroppings.com/Images/Icons/IconLOL.gif)
Maybe 50k/acre is a pure line item in a bid tab on $/CY basis, but once you add in all of the entirely necessary ancillary line items like the permitting and land rights and geotech and surveying it is never 50k/acre except in the smallest of projects
Posted on 5/10/24 at 3:07 pm to man in the stadium
quote:
So that narrows you down to someone who works for either: 1) a private dredge contractor, who would stand to benefit most from redirected funds from diversions, or 2) MVN navigation ops, and the USACE is has proven they really know how to run a delta over the longterm
Wrong
Posted on 5/10/24 at 3:14 pm to man in the stadium
quote:
Maybe 50k/acre is a pure line item in a bid tab on $/CY basis, but once you add in all of the entirely necessary ancillary line items like the permitting and land rights and geotech and surveying it is never 50k/acre except in the smallest of projects
Just an FYI, since you think you are an expert, it gets much cheaper (per CY or acre) the bigger your project gets.
Popular
Back to top
![logo](https://images.tigerdroppings.com/images/layout/TDIcon.jpg)