Chimes Lafayette - Construction Update

Posted on 4/18/23 at 10:35 am
Posted by I10 Bengal
Member since Jan 2020
52 posts
Posted on 4/18/23 at 10:35 am
Has anyone heard an update on the Chimes being built in Lafayette? For several months the construction was quickly coming along. Now it seems as though it has grinded to a halt. I drive by regularly and there has not been any progress or even any sign of workers on site. Very strange. Wondering if they hit some kind of snag with permitting, etc.
Posted by Cosmo
glassman's guest house
Member since Oct 2003
129657 posts
Posted on 4/18/23 at 10:39 am to
“Supply chain issues”
Posted by Got Blaze
Youngsville
Member since Dec 2013
9917 posts
Posted on 4/18/23 at 11:07 am to
the interior structure/framing and exterior construction (bricks) have obviously been completed. Appears electrical wiring has also been done as I see lights on at night. Construction laborers may have floated the sheetrock and painted walls. As suggested above, probably a delay in getting certain industrial grade appliances, lighting fixtures, and special ordered items due to product manufacturing delays. I thought their goal was to open around June 1
Posted by I10 Bengal
Member since Jan 2020
52 posts
Posted on 4/18/23 at 11:13 am to
quote:

the interior structure/framing and exterior construction (bricks) have obviously been completed. Appears electrical wiring has also been done as I see lights on at night. Construction laborers may have floated the sheetrock and painted walls. As suggested above, probably a delay in getting certain industrial grade appliances, lighting fixtures, and special ordered items due to product manufacturing delays. I thought their goal was to open around June 1



The June-ish opening target was my understanding as well. I just find it odd that there is never any construction labor there anymore.

The outside is not finished (painting, etc.). I would figure that could still continue even if they are having trouble with other supplies.
Posted by Kim Jong Ir
Baton Rouge
Member since Jan 2008
54925 posts
Posted on 4/18/23 at 12:03 pm to
quote:

As suggested above, probably a delay in getting certain industrial grade appliances, lighting fixtures, and special ordered items due to product manufacturing delays


This is correct. Mechanical/HVAC supply chain issues are the reason.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on X, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookXInstagram