Started By
Message

re: GC’s and Electrical Contractors - Lack of Availability of Breakers above 200A

Posted on 12/3/22 at 6:38 pm to
Posted by bee Rye
New orleans
Member since Jan 2006
33985 posts
Posted on 12/3/22 at 6:38 pm to
quote:

as usual it’s not just one thing. Specific to the 320/400 meter pans I have been told that milbank can’t get the resins for the socket. Who knows if that’s true but it’s a mess right now.


That’s not true, and the resins haven’t been a shortage issue in the last 6 months.

Milbank dug themselves a hole, and aren’t willing to get themselves out of it by restricting orders. They have told me the demand for 320 meters is higher than ever and they keep taking any order thrown at them
Posted by stout
Smoking Crack with Hunter Biden
Member since Sep 2006
167875 posts
Posted on 12/3/22 at 6:40 pm to
I needed a meter base for a rent house two weeks ago and was told I was lucky they just happened to get some in that had been on order for a while.

That was after looking everywhere else.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram