Started By
Message

re: Final three routes for new bridge released.

Posted on 5/27/22 at 9:38 am to
Posted by LNCHBOX
70448
Member since Jun 2009
84379 posts
Posted on 5/27/22 at 9:38 am to
Just need to get from wherever the new bridge runs into LA1 to I10 somewhere more like Grosse Tete and boom, effective loop
Posted by Bard
Definitely NOT an admin
Member since Oct 2008
51877 posts
Posted on 5/27/22 at 10:20 am to
quote:

Just need to get from wherever the new bridge runs into LA1 to I10 somewhere more like Grosse Tete and boom, effective loop



Yep. That will be one ginormous loop and would likely have to start in Ramah just to make the intersection not so harsh a turn.



That adds almost 10 miles to the trek from Ramah to Walker. Traffic going south on 10 or to plants along the river would still benefit from this as well as anyone travelling east whose destination is somewhere along LA 1 (within the Plaquemine-Donaldsonville corridor) but passthrough traffic?

I hope 4 (ideally 6) laning Nicholson/30 down to it is part of their eventual plans.
Posted by bakersman
Shreveport
Member since Apr 2011
5723 posts
Posted on 5/27/22 at 6:09 pm to
quote:

Just need to get from wherever the new bridge runs into LA1 to I10 somewhere more like Grosse Tete and boom, effective loop


Also needs to connect to 190 between Livonia and erwinville
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram