Started By
Message

re: Causeway's $40M safety railings weren't installed correctly

Posted on 5/5/21 at 6:45 pm to
Posted by John88
Member since Sep 2015
6225 posts
Posted on 5/5/21 at 6:45 pm to
Frick. Same company that is doing the construction in Covington.
Posted by Bulldozer1899
Member since Aug 2017
142 posts
Posted on 5/5/21 at 7:53 pm to
JB James did la21 in Covington and now i12 from la21 to us90. JB James already pulled off of the i12 job and is now back.

If you know the “upper management” of JB James you would understand how this happened.

The owner of JB James is the great grandson of TL James.

The LADOTD does not like JB James. They did the i10 widening at transcontinental in Metairie and took for ever.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram