Started By
Message

re: Engineers of the OB: Will this bridge support a loaded log truck?

Posted on 10/20/20 at 1:05 pm to
Posted by holmesbr
Baton Rouge, La.
Member since Feb 2012
3222 posts
Posted on 10/20/20 at 1:05 pm to
I'm not an engineer but how far on the dirt is that beam or is there a concrete pad/footing there?
Posted by No Colors
Sandbar
Member since Sep 2010
11124 posts
Posted on 10/20/20 at 1:30 pm to
quote:

how far on the dirt is that beam or is there a concrete pad/footing there?


So far into the dirt that we couldn't find the end of them....I'm guessing 10' on each side. There was some erosion on the near side in the photograph. So we built a form and poured 5 yards of concrete there.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram