- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: Is this contractor on crack?
Posted on 3/21/20 at 1:14 pm to bayoudude
Posted on 3/21/20 at 1:14 pm to bayoudude
that’s a fair point Bayou... if the GC wants to replace ALL the substructure in the joists/beams/headers (all 12 by) then that would roll up the costs quick... But I still can’t see 26k.
Unless it was in Trex, with terracing and tiki hut and built in hot tub and anything else one can imagine. That’s over $50.00 per square foot on the build. This house can have a 3rd story tacked on to it - including plumbing and elec - for that price per sqft.
Unless it was in Trex, with terracing and tiki hut and built in hot tub and anything else one can imagine. That’s over $50.00 per square foot on the build. This house can have a 3rd story tacked on to it - including plumbing and elec - for that price per sqft.
Popular
Back to top
Follow TigerDroppings for LSU Football News