- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: Spencer Callahan $9M building status?
Posted on 5/8/18 at 12:44 pm to JamalSanders
Posted on 5/8/18 at 12:44 pm to JamalSanders
quote:
drilled pile
in common construction discussions, we use the terms "drilled" and "driven" all the time. "Drilled" is used interchangeably with "auger-cast". "Driven" is used interchangeably with "timber pile" or "pre-cast pile"...everyone knows what you mean when you're talking with engineers and on the job site. And no one gets in a pissin contest over what we're gonna call the deep arse hole with rebar and concrete in it.
Posted on 5/8/18 at 12:48 pm to Duckhammer_77
quote:
common construction discussions, we use the terms "drilled" and "driven" all the time.
Well aware, it's how I earn a living.
quote:
everyone knows what you mean when you're talking with engineers and on the job site. And no one gets in a pissin contest over what we're gonna call the deep arse hole with rebar and concrete in it.
Piles and shafts are very different in how they are constructed. A deep arse hole that you fill with rebar and concrete is a drilled shaft and not a pile. If you mix those up it could be a huge frick up.
This ain't close to being pissy, this is trying to make heads or tails of what dude was talking about.
Popular
Back to top
![logo](https://images.tigerdroppings.com/images/layout/TDIcon.jpg)