Started By
Message

re: Building cost / sq. Ft.

Posted on 6/15/17 at 8:51 am to
Posted by PLaneTiger
Member since Jun 2014
863 posts
Posted on 6/15/17 at 8:51 am to
What was the costs involving getting your lot and getting it prepared?
Posted by HamCandy
Team Meat
Member since Dec 2008
898 posts
Posted on 6/15/17 at 9:06 am to
If you calculate the lot in the total we spent it was about 15% of the hole project.

The contractor included clear/fill/grade as A BUDGET number bc he was unsure how much fill would be required until the lot was cleared. That was right at 21K. We went over that to help grade the lot out better and to make the garage and house design jive better and that was roughly 6-7K extra.

The well and septic came in at 7K.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram