Started By
Message

re: Proposed and Conceptual Interstate Corridors in Louisiana

Posted on 11/3/15 at 3:55 pm to
Posted by TigerDog83
Member since Oct 2005
8348 posts
Posted on 11/3/15 at 3:55 pm to
quote:

In the end, this is what they have to work through. That is why I think if they built the interstate through that area, it would need to be below grade. Keep/reconnect the established street grid and let the freeway be secondary.


This would be workable to get the interstate through the area. The two existing cross streets could be maintained and the abandoned fields and overgrown lots can live to wait until they were ever developed. Probably only looking at relocating a handful of residents who probably are mostly living in rental houses if I was to guess in that part of Allendale.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram