Started By
Message

re: who had tile work done and how much did it cost?

Posted on 7/19/15 at 9:20 am to
Posted by Triggerr
Member since Jul 2013
1905 posts
Posted on 7/19/15 at 9:20 am to
Over slab or raised floor? If over raised floor is the backer board already down, if over slab are you using a crack isolation membrane etc. Where you located? What's shape of the room, are there a lot of cuts and things to cut around? Put shoe mold other trim etc down after finished? You supplying all materials? few factors to consider
Probably could get it done for you $750-$1000
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram