Started By
Message

re: Maurepas Swamp Diversion Project

Posted on 5/20/15 at 6:40 pm to
Posted by 2indapink
Member since Mar 2012
541 posts
Posted on 5/20/15 at 6:40 pm to
Too little WAY too fricking late
Posted by man in the stadium
Member since Aug 2006
1410 posts
Posted on 5/20/15 at 9:54 pm to
Not really. The main detriments to the entire Maurepas basin are a) the cypress clear cut logging b) the interstate, railroads, spoil banks etc that have impounded various portions of the swamp. Cypress saplings need a variation of wet and dry and at the moment, a lot of them just get the wet part. The future West Shore LAke Ponthartrain levee will impound more.

Also, there has been extensive modeling done and it has all shown a small freshwater diversion is all that's needed to freshen most of the southern part of the basin.

Currently, the modeling is under review. Sadly it had taken roughly a decade to study, which is unacceptable.
This post was edited on 5/20/15 at 9:57 pm
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram