Started By
Message

re: North Endzone refurb

Posted on 11/29/12 at 3:31 pm to
Posted by Golfer
Member since Nov 2005
75052 posts
Posted on 11/29/12 at 3:31 pm to
quote:

The only really noticeable thing is that all the crappy chainlink in front of the lawton room and the student entrance is gone


Based on the renderings from the 2009 Strategic plan, it looks like they will be re-doing the sidewalks, gates, and lighting on the ground.
Posted by TigersOfGeauxld
Just across the water...
Member since Aug 2009
25057 posts
Posted on 12/1/12 at 12:12 pm to
quote:

Based on the renderings from the 2009 Strategic plan, it looks like they will be re-doing the sidewalks, gates, and lighting on the ground.


Yup. And work on the NEZ will likely be started sometime in 2016 or 2017.

Alleva has stated he wants time for all the suites in the SEZ expansion to sell and the demand for new suites to build to the point where it becomes certain that there will be no problems selling out the NEZ suites. That's not currently the case. This is all about maximizing LSU's ROI.

And TIFWIW, but don't expect the NEZ expansion to look exactly like the SEZ expansion. The SEZ expansion was about covering up an eyesore. The NEZ expansion will be about showcasing what is right about TS.

This post was edited on 12/1/12 at 1:07 pm
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram