Started By
Message

re: Pouring Concrete

Posted on 8/10/12 at 2:46 pm to
Posted by mandevilletiger34
Member since Dec 2010
863 posts
Posted on 8/10/12 at 2:46 pm to
quote:

Then pour concrete at a 3-5 inch slump


for this purpose i think a 2-4 would be more practical along with a few stress breaks at 7 & 28 days
Posted by Elusiveporpi
Below I-10
Member since Feb 2011
2584 posts
Posted on 8/10/12 at 5:29 pm to
Yes. Need and early break so we can move equipment on the patio
Posted by VetteGuy
Member since Feb 2008
30134 posts
Posted on 8/10/12 at 9:22 pm to
No post-tension?
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram