Started By
Message

re: Retarded/simple solution thread: Oil Spill

Posted on 5/2/10 at 4:36 pm to
Posted by JWS3
Baton Rouge
Member since Jun 2008
2502 posts
Posted on 5/2/10 at 4:36 pm to
The drill pipe from the rig to the ocean floor and was obviously at least a mile long. Also, the "riser" connecting the drilling vessel on the surface to the blowout preventer stack on the ocean floor is also a mile long "pipe" held vertical by the surface vessel. The length of pipoe required is not a problem, and BP is currently tryinhg to use this exact solution, it just takes time to assemble the pieces needed.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram