- My Forums
- Tiger Rant
- LSU Recruiting
- SEC Rant
- Saints Talk
- Pelicans Talk
- More Sports Board
- Fantasy Sports
- Golf Board
- Soccer Board
- O-T Lounge
- Tech Board
- Home/Garden Board
- Outdoor Board
- Health/Fitness Board
- Movie/TV Board
- Book Board
- Music Board
- Political Talk
- Money Talk
- Fark Board
- Gaming Board
- Travel Board
- Food/Drink Board
- Ticket Exchange
- TD Help Board
Customize My Forums- View All Forums
- Show Left Links
- Topic Sort Options
- Trending Topics
- Recent Topics
- Active Topics
Started By
Message
re: Retarded/simple solution thread: Oil Spill
Posted on 5/2/10 at 4:36 pm to LSURussian
Posted on 5/2/10 at 4:36 pm to LSURussian
The drill pipe from the rig to the ocean floor and was obviously at least a mile long. Also, the "riser" connecting the drilling vessel on the surface to the blowout preventer stack on the ocean floor is also a mile long "pipe" held vertical by the surface vessel. The length of pipoe required is not a problem, and BP is currently tryinhg to use this exact solution, it just takes time to assemble the pieces needed.
Popular
Back to top
![logo](https://images.tigerdroppings.com/images/layout/TDIcon.jpg)