Started By
Message

re: developers planning outdoor dining/events area on the river north of the fly, uptown NOLA

Posted on 11/29/23 at 11:18 am to
Posted by Jim Rockford
Member since May 2011
98754 posts
Posted on 11/29/23 at 11:18 am to
quote:

they'll have engineers to deal with that. we just finished a new building at waterford 3 and had to de-water the entire site for two weeks just so we could dig an 8' deep hole for a lift station


When they dug the foundations for the LNB building (whatever it's called now) in downtown BR, they froze the area with liquid nitrogen. That's what a professor told us anyway.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram